Three Under Graduate Programs (CSE, EE & CE) are accredited by National Board of Accreditation as per Washington Accord  |    Short films on ill effects of ragging  |    Admission Notification for NRI & Kashmiri Migrants-2017  |    Link to download Admit Card of Admission Test-2017  |    On Line Application For Recruitment 2017 of Various Teaching Post

CENTRAL FACILITY ITRC


Vision

Our vision is to create an state of art intranet which enables the sharing of knowledge base round the clock through wider internet bandwidth.
Download ITRC Facilities

Objectives

  • To provide inter connectivity among different departments and enhance existing facility to access internet worldwide effectively through a 2 Mbps dedicated leased line connectivity.
  • To provide central computing facilities to student and staff for their learning, classroom teaching and research needs.
  • To strengthen the PG Programme in different departments.
  • To conduct short / long term intensive training programme to the working professionals as per industry/ institutions needs.
  • To prepare and disseminate the instructional material related to design methodologies (viz. VLSI design, CAD design, Multimedia based design etc.)
  • To provide LAN connection to faculty ,cabins faculty residences and hostels to access centralized facility available in the resource center round the clock
  • To offer a variety of training programmes on all emerging areas of computing and engineering design.
  • To provide specialized design software's to cater the specific needs of different departments.

DIVISION OF IT RESOURCE CENTER

DESIGN CENTER:
  • Three clusters; each with 15 nodes & one server.
  • ECED & EED (Design Tools of Electronics & Electrical; MATLAB, Embedded system.
  • MED & CED (CAD/ CAM )
  • CSED (Multimedia & other tools
COMPUTING CENTER:
  • Internet Connectivity: 34 Mbps (1:1) Leased Line,
    2 Mbps (1:1) RF link,
    10 Mbps broadband connection.
  • 8 Server (Web, Proxy, Mail, Data-base, Linux & Netware
  • 200 nodes( intelligent)
  • Software
  • Printers, Scanners & other accessories
CAMPUS NETWORKING:
  • Departments
  • Library
  • Admin Blocks
  • Boys Hostel
  • Girls Hostel
  • Residences

ELEMENTS OF IT-Resource Center


List of Software:
S.No.
Name Of Item
Make
1.
Microsoft windows 2003 server-enterprise for 50 users MICROSOFT
2.
Red Hat Enterprise Linux ES 4.0 Standard Edition REDHAT
3.
Mail server on Linux MICROSOFT
4.
Proxy server on Linux -
5.
Linux ftp Server for Intranet -
6.
Oracle 10g Enterprise Edition (50 users) ORACLE
7.
Oracle Internet Development suit ORACLE
8.
Visual Studio.Net 2003-professional Edition MICROSOFT
9.
Symantic Antivirus Corporation Edition for workstation & Server (50 users) -
10.
Language Compilers in Unix Environment (C,C++,Java) -
11.
MSDN MICROSOFT

List Of Node and Server:
S.No.
Name of Item
Qty.(Nos.)
Model No.
1.
Server
02
HP Server ML 350G4
2.
Node
50
HP Model DX 6120
3.
Server
02
HP Server ML 370G4
4.
Server
02
HP Server ML 370G4
5.
Server
02
HP Server ML 370G4
6.
Node (15")
30
Hp Dx6120 3.2 GHz
7.
Node (17")
70
Hp Dx6120 3.2 GHz
8.
Node (TFT)
05
Hp Dx6120 3.2 GHz
9.
Work Stations
45
Hp xw4400 Workstation

List of Peripherals:
S.No.
Name of Item
Qty.(Nos.)
Make
1.
LCD projector
1
HP /AMMC534A0392
2.
Line Matrix Printer
1
L1P1 Model No. T 6312
3.
Laser Printer
1
HP Model Laser Jet 2420 DN Heavy duty
4.
Laser Printer
1
HP Model Laser Jet 1320
5.
Dot Matrix Printer
1
Wipro Model No. Ex 330+
6.
Scanner
1
HP Model No. 3770
7.
10 KVA Online UPS
2
Neo Power Model No. HF 10
8.
10 KVA Online UPS
1
Neo Power Model No. HF 10
9.
10 KVA Online UPS
2
Jyoti-CONSUL205602350205602359
10.
5 KVA Online UPS
1
Jyoti-CONSUL
11.
750 VA Offline UPS
2
Neo Power
12.
D.G. Set (10KVA) 10KVA DG set
1
10 KVA DG set with Kirloskar TAF2 Engine 13.3 BHP at 1500 RPM Engine no. 21.1289/0500317 M/C no. 04AH559-11
Routers, Modems Leased Line etc.:

S.No.
Name of Item
Qty.(Nos.)
Make
1.
RAD Modem ASMI 52/2W/G.703
1
MROTEK-512217
2.
ASMI 52/M/2W/V.35 RAD Modem
1
MROTEK
3.
CISCO-Power -card-cab-ace
1
CISCO
4.
CISCO-Cables-CAB-SS-V35MT
2
CISCO
5.
CISCO-ROUTERS-NETWORK-1760 10/100 Modem router
1
CISCO-FHK094322PQ
6.
CISCO-ROUTERS-NETWORK-W/C-2T
1
CISCO
7.
2 Mbps leased line internet Connection at the I.T. Resource Center of University (installation, Rent per year
1
 
IT Resource center facility to Library:
  • Sever HP with windows 2000 server
  • UPS .75 KVA
  • Cable with RJ45 Connector.

Contact Address : itrc@mmmec.ac.in